Sahaja Yoga Australia
 

Balmoral Renewal Project – Progress update 3rd January 2021

Jai Shri Mataji 

Dear Yogis,

Sharing an update with some of the new arrangements that have been made possible at Balmoral as part of the Renewal Project that has been underway during 2020.Balmoral new

  • Havan and Amphitheater
  • New arrangements to access the Dams

Balmoral new Havan and Amphitheater

A new Havan area has been created at our property, facing the dam. This has been designed to host Havans for the collective. It has been designed in the style of the Amphitheater so it is also very suitable as an outdoor performance area during the warmer months of the year.

New arrangements to access the Dams

Adjacent to the new Havan area, are two new self closing Child Safe pool fence gates. These have been installed as the only points of entry to the areas of our property where the dams are located. The former country style gate that was used to access the Dams will be kept closed as a safety precaution. Everyone seeking to enjoy the bush areas of our property or to access the Dams will need to gain entry using the new Child Safe gates.  A new wooden boundary fence has also been built which is securing  access to the dams. The new wooden fence is both sturdier and more child safe compared to the former wire fence.

Her Holiness Shri Mataji Nirmala Devi New Year’s Day 2021 Cabella

With Love
Brett and the Trustees

Leave a Reply

Your email address will not be published. Required fields are marked *